Thanks. But still.
by squid (2019-04-16 11:59:40)

In reply to: Looks like this is a height change *  posted by El Kabong


I would have thought Crossroads would have taken into account the [height] needs of touring acts. But maybe it was considered and construction was pushed until actually needed.


I hear you
by The Holtz Room  (2019-04-17 22:15:11)     cannot delete  |  Edit  |  Return to Board  |  Ignore Poster   |   Highlight Poster  |   Reply to Post


Are we talking about the original tunnel?
by ndroman21  (2019-04-17 14:05:16)     cannot delete  |  Edit  |  Return to Board  |  Ignore Poster   |   Highlight Poster  |   Reply to Post

Probably wasn't part of the scope of work to make modifications to the existing stadium.


Yes, the tunnel on the north end of the field
by Hometown fan  (2019-04-17 14:37:58)     cannot delete  |  Edit  |  Return to Board  |  Ignore Poster   |   Highlight Poster  |   Reply to Post

They are removing 8ish rows of seats the width of the tunnel. They were gone Saturday. They will then cut out the concrete, increasing the height of the tunnel as the entrance to the field will now be farther back from the field


Architects only considered chimpanzees on roller skates acts
by Frank Drebin  (2019-04-16 12:38:51)     cannot delete  |  Edit  |  Return to Board  |  Ignore Poster   |   Highlight Poster  |   Reply to Post

Stadium planners tend to only focus on those forms of entertainment that they themselves enjoy.